Immokalee Stormwater Master Plan Update
Client: Collier County (sub-consultant to Robau & Associates) Year: 2016-2018 About: The first objective of this project was to conduct a comprehensive update of the XP-SWMM model originally developed in 2004. The updated model was then used to evaluate nine (9) proposed projects and subprojects to improve the stormwater management system. Design storm simulations for the 10- and 25-year/3-day storm events were utilized. Water quality improvements from the proposed ponds were also evaluated using the Harvey-Harper Method. |
Applied Skills:
|
Specifics:
The model update included:
|
Outcome:
The updated model was used to evaluate the stormwater management system in Immokalee and to estimate the potential effects of the proposed projects to reduce the extent and duration of flooding in the project area. Flood inundation maps and road Level of Service (LOS) compliance maps were produced for this evaluation. The proposed designs were adjusted according to the model results in order to optimize performance. |