C-43 Reservoir: MIKE SHE Modeling
Client: South Florida Water Management District (sub-consultant to Carollo Engineers) Year: 2017-2018 About: Lago provided modeling support for the C-43 Reservoir design of canals and structures. The MIKE SHE models developed in 2007 for the pre- and post-project conditions were rerun using in the latest software version with recommended options and parameters. Limited updates were made to the irrigation and MIKE11 components of the model based on review of water use and storm water permits. The revised model was then applied to evaluate different design alternatives. |
Applied Skills:
|
Specifics:
Model results were used to support structure and channel design. The following scenarios were considered:
|
Outcome:
The results of the Hydrologic and Hydraulic analysis modeling effort indicate that the C-43 Reservoir project will provide adequate protection to surrounding projects. |